Kitchen & Bathroom floor framed

I managed to get the kitchen & bathroom floor framed today. I had hoped to do more.  I was planning on stopping at the hardware store and  ordering materials on Thursday but had an emergency at a client site in Montpelier so I didn’t make it in time.  I got them ordered yesterday and they arrived around 10:30 this morning so I lost several hours.
The kitchen & bathroom floor is 8′ wide by 13’9″ and framed with 2x4s.  This is the floor framed, squared, positioned and the trailer marked for drilling holes to bolt the floor down.

Then the pressure treated plywood that will become the bottom of the floor framing was glued and nailed on.  Here’s the first sheet nailed in place.

And finally, all the plywood installed.  Next step is to move it off of the trailer and drill holes, then flip the floor over an put it back in place and bolt it down.  I managed to get it off of the trailer before I ran out of time today.

Advertisements
Categories: Uncategorized | Leave a comment

Post navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Create a free website or blog at WordPress.com.

%d bloggers like this: